FOUNDRY & FORGE
Digitizing manufacturing for
distributed shipbuilding
distributed shipbuilding
Sign in to your manufacturing workspace
Forgot password?
— or —
FOUNDRY & FORGE
badge
Scan Your Badge
Hold badge to reader to begin
contactless Tap to Simulate Badge Scan
Recommended RFQs for Your Shop
All Shipyards7
HII-Ingalls2
HII-Newport News1
Bath Iron Works1
Electric Boat1
GD-NASSCO1
Austal USA0
Fincantieri Marinette1
Security: Unclass7
Sort by
Fit Score
Posted
Job Size
23mRFQ-2026-0147
94HII-Ingalls
5hrsRFQ-2026-0161
91HII-Ingalls
Feb 11, 26RFQ-2026-0152
87Bath Iron Works
Feb 08, 26RFQ-2026-0138
72HII-Newport News
Feb 05, 26RFQ-2026-0155
68Bath Iron Works
Feb 03, 26RFQ-2026-0168
79Electric Boat
Feb 01, 26RFQ-2026-0172
74Fincantieri Marinette
| Score | RFQ ID | Posted | Shipyard | Program | Description | Tags |
|---|---|---|---|---|---|---|
| 94 | RFQ-2026-0147 | 23m | HII-Ingalls | DDG-51 Flight III | Pump mounting bracket, HY-80 weldment | |
| 91 | RFQ-2026-0161 | 5hrs | HII-Ingalls | LPD-32 | Bearing housing, HY-100 forging | |
| 87 | RFQ-2026-0152 | Feb 11, 26 | Bath Iron Works | DDG-51 Flight III | Valve body, CRES 316L machined | |
| 72 | RFQ-2026-0138 | Feb 08, 26 | HII-Newport News | CVN-81 | Pipe spool assembly, CuNi 70/30 | |
| 68 | RFQ-2026-0155 | Feb 05, 26 | Bath Iron Works | FFG-62 | Structural bracket, HSLA-80 plate |
Key Metrics
Open RFQs north_east
23
4 overdue
Win Rate (12mo) north_east
34%
↑ 6% vs prior year
Avg Quote Cycle north_east
4.2d
Target: 3.5 days
Jobs In-Work north_east
12
3 at-risk
Open NCRs north_east
5
2 awaiting disposition
Avg Margin north_east
22%
DDG program: 26%
Pipeline Summary
Last 6 months
$2.57M
Total Active
Total Active
Quoted$1.2M
Negotiating$480K
Won$890K
Lost$320K
Ready-to-Work Queue
| Job | Part | Status |
|---|---|---|
| J-2026-038 | Valve body | RTW Ready |
| J-2026-031 | Pump bracket | Materials check QA pending |
| J-2026-042 | Pump bracket | Materials on order |
Total Pipeline north_east
$2.4M
+18% QoQ
Due This Week north_east
8
3 overdue
12mo Hit Rate north_east
34%
↑ 6% vs prior year
Avg Response Time north_east
4.2d
Target: 3.5 days
Saved Views
addSave Current Filters...
Sort by
Newest First
Oldest First
Due Soonest
Due Latest
Fit Score ↓
Fit Score ↑
Value ↓
Value ↑
Status A→Z
Status Z→A
Filters
Shipyard
HII-Ingalls
HII-Newport News
Bath Iron Works
Electric Boat
GD-NASSCO
Austal USA
Fincantieri Marinette
Program / Hull
DDG-51 Flight III
CVN-81 Ford
SSN-810 Virginia
SSBN-826 Columbia
LPD-32 San Antonio
FFG-62 Constellation
LHA-9 America
T-AO-205 John Lewis
EPF Spearhead
Security Classification
All
Unclassified
CUI
Secret
Top Secret
Fit Score
to
Est. Value ($K)
to
Due Date
to
From
To
Status
checkNew
checkIn Estimating
checkInternal Review
checkSubmitted
checkAwarded
checkLost
Material / Capability
HY-80
HY-100
HY-130
HSLA-80
CRES 316L
CRES 304L
CuNi 70/30
AL 5456
AL 5083
DH-36
Tags / Match Indicators
checkQA Match
checkPrior Jobs
checkNAICS Match
checkCapability Match
checkClearance Match
| RFQ ID | Postedarrow_downward | Shipyard | Program | Description | Due Date | Fit | Status | Value |
|---|
New 2
RFQ-0152 — Valve body
Bath Iron Works · Feb 25
Fit: 87RFQ-0155 — Structural bracket
Bath Iron Works · Mar 10
Fit: 68In Estimating 1
RFQ-0138 — Pipe spool
HII-NNS · Mar 3
Fit: 72Internal Review 1
RFQ-0129 — Motor mount
HII-Ingalls · Feb 18
Fit: 82Submitted 2
RFQ-0147 — Pump bracket
HII-Ingalls · Feb 20
Fit: 94RFQ-0161 — Bearing housing
HII-Ingalls · Feb 28
Fit: 91Awarded 1
RFQ-0119 — Hatch frame
HII-NNS · Jan 30
Lost 0
No RFQs
RFQ Details
Line Items
| Part ID | Description | Qty | Due | Status |
|---|---|---|---|---|
| Draft |
Attachments
Drop files here — RFQ PDF, SOW, drawings, 3D models
Paste & Extract AI-Assisted
RFQ Summary
Shipyard
HII-Ingalls
Program
DDG-51 Flight III
Hull Number
DDG-138
Est. Value
$48,200
Due Date
Feb 20, 2026
Qty
12 pcs
Line Items
| Part | Qty | Material | Due |
|---|---|---|---|
| Pump mounting bracket | 12 | HY-80 | Mar 15 |
Attachments (4)
description
RFQ.pdf
RFQ.pdf
description
SOW.pdf
SOW.pdf
description
DWG.pdf
DWG.pdf
description
Model.step
Model.step
Fit Analysis 94/100
"Based on 7 similar HY-80 weldment parts built for DDG-51, this RFQ aligns strongly with your proven capability and margin profile."
Capability Match
check 7 similar jobs in last 24 months · Avg schedule: +2 days early · NCR rate: 0.4%
Profitability
check Avg margin on similar work: +22% · Estimated margin: 24%
Blocking Issues
None — all requirements within current capability
Navy Requirements Parsed
Security
Classification: Unclassified · No DD-254 required
Quality/Inspection
NAVSEA 009-04 QMS · Standard TIP · Codes: (I), (V)
Standards
MIL-STD-31000C · NAVSEA Std Items 009-04, 009-25
ML Comparison Analysis 3 Matches
Feature extraction identified weld joint types, material thickness, tolerance bands, hole patterns, and mounting geometry from the RFQ engineering drawings.
| Job | Part | Feature Match | Margin | NCRs | |
|---|---|---|---|---|---|
| J-2024-018 | Pump bracket v1 | 92% | +26% | 0 | ▶ |
| J-2023-041 | Bearing mount HY-80 | 84% | +21% | 1 | ▶ |
| J-2025-067 | Valve support HY-80 | 78% | +14% | 2 | ▶ |
share Share Quick Look
Send a link so team members can view and comment on this 3D model.
DT
Dave Torres
radio_button_unchecked
SC
Sarah Chen
radio_button_unchecked
MJ
Mike Johnson
radio_button_unchecked
precision_manufacturing Weld Callouts
Joint 1 — Base to Wall (L)
Full pen groove · WPS-007 · HY-80
Est: 1.2 hrs → Revised: 1.4 hrs/ea
Joint 2 — Base to Wall (R)
Full pen groove · WPS-007 · HY-80
Est: 1.2 hrs → Revised: 1.3 hrs/ea
Joint 3 — Top Gusset
Fillet weld · WPS-012 · HY-80
Est: 0.8 hrs → Revised: 0.8 hrs/ea
Total Weld
3.5 hrs/ea
info Model Info
SourceTDP Drawing Set
RenderMesh (from STEP)
Triangles12,847
Bounding14.75" × 8.25" × 6.50"
Weight42.3 lbs (est)
MaterialHY-80 Steel
Part Basics
Routing
| Op | Name | Center | Setup | Run/pc |
|---|---|---|---|---|
| 10 | Saw | Saw Bay | 0.5h | 0.1h |
| 20 | CNC Mill | Haas VF-4 | 2.0h | 1.5h |
| 30 | Weld | Weld Cell 2 | 0.5h | 3.5h |
| 40 | NDT - MT | NDT Lab | 0.3h | 0.4h |
| 50 | Final Inspect | QA | 0.2h | 0.5h |
Compliance
ITAR check_circleWeld Cert check_circleNDT Req check_circleSpecial QA check_circleSub-contract check_circle
Cost Summary — Live
Direct Labor
$19,950
Material
$12,600
Overhead
$5,985
Total Cost
$38,535
Quote Price
$51,200
Margin
24.7%
Rush:OffRisk Markup:
Labor Details
| Work Center | Hours | Rate | Cost |
|---|---|---|---|
| Saw Bay | 1.7h | $65/hr | $111 |
| CNC Mill | 20.0h | $85/hr | $1,700 |
| Weld Cell | 42.5h | $95/hr | $4,038 |
| NDT Lab | 5.1h | $80/hr | $408 |
| QA Inspect | 6.2h | $75/hr | $465 |
Lead-Time Estimate
Earliest promise date: Mar 12 (3 days slack)
Customer & Terms
Win Context
Attachments (4)
descriptionRFQ.pdf
descriptionSOW.pdf
descriptionDWG.pdf
description3D.step
Quote Versions
v1 — Maria, Feb 10 — Initial estimate
v2 — Maria, Feb 12 — Adjusted weld hours
Quote Header
Internal Approval
Submitted for approval by Maria · Feb 12, 2026 3:42 PM
Quote PDF Preview
Submission Tracking
Award Details — RFQ-2026-0147
Award vs Quote Comparison
| Line | Part | Quoted Price | Award Price | Quoted Date | Award Date | Δ |
|---|---|---|---|---|---|---|
| 1 | Pump bracket × 12 | $51,200 | $50,500 | Mar 12 | Mar 15 | -$700 / +3 days |
Generate Jobs
| check | Line | Part | Job ID (auto) | Planned Start | Due |
|---|---|---|---|---|---|
| check_box | 1 | Pump bracket × 12 | J-2026-042 | Feb 24, 2026 | Mar 15, 2026 |
Active Jobs north_east
37
12 new this month
On-Time Rate north_east
91%
↑ 3% vs last month
Overdue north_east
4
2 critical
Avg Cycle Time north_east
18d
Target: 21 days
Saved Views
addSave Current Filters...
Sort by
Due Soonest
Due Latest
Status A→Z
Status Z→A
Customer A→Z
Customer Z→A
Priority High→Low
Priority Low→High
Schedule Risk ↓
Schedule Risk ↑
Filters
Customer
HII-Ingalls
HII-Newport News
Bath Iron Works
Electric Boat
GD-NASSCO
Austal USA
Fincantieri Marinette
Program
DDG-51 Flight III
CVN-81 Ford
SSN-810 Virginia
SSBN-826 Columbia
LPD-32
FFG-62 Constellation
T-AO-205
Status
checkPlanned
checkRTW Ready
checkRTW Released
checkIn Work
checkComplete
Priority
checkHigh
checkMedium
checkLow
Due Date
to
From
To
| Job ID | Part | Customer | Program | Qty | Status | Duearrow_upward | Schedule | Priority |
|---|
Schedule
On Track
2 days slack remaining
Cost — Est vs Actual
$98K / $62K
63% budget at 60% complete
Quality
0 NCRs
All inspections passing
Completion — Predicted vs Actual
62% / 60%
On pace — Op 30 in progress
Operations Progress
Activity Feed
Feb 12, 3:15 PM · System
Op 20 (CNC Mill) completed — 6/6 parts passed inspection
Op 20 (CNC Mill) completed — 6/6 parts passed inspection
Feb 12, 8:00 AM · Mike R.
Started Op 30 (Weld) — Weld Cell 2
Started Op 30 (Weld) — Weld Cell 2
Feb 11, 4:30 PM · Maria
RTW released — all checklist items confirmed
RTW released — all checklist items confirmed
Feb 10, 2:00 PM · Sarah K.
Traveler approved for J-2026-038
Traveler approved for J-2026-038
RTW Checklist
check Materials confirmed
check Traveler reviewed & approved
check QA plan approved
Released by: Maria · Feb 11
Operations
Op 10 — Saw
check Complete
Op 20 — CNC Mill
check Complete
Op 30 — Weld
radio_button_checked In Progress
Op 40 — NDT - MT
Pending
Op 50 — Final Inspect
Pending
Op 30 — Weld In Progress
Work Center
Weld Cell 2
Operator
Mike R.
Setup / Run
0.5h / 2.0h per pc
Work Instructions
Step 1: Verify material heat number matches traveler. Record on weld log.
Step 2: Set up fixture per DWG-4517-FIX-R1. Align bracket to ±0.010" per GD&T callout.
Step 3: Weld per WPS-HY80-GMAW-01. Use filler ER100S-1, 75/25 Ar/CO2 shielding.
warning CAUTION: Preheat to 200°F min. Max interpass temp 400°F. Monitor with contact pyrometer.
Attachments
description
DWG-4517-R2.pdf
DWG-4517-R2.pdf
description
WPS-HY80.pdf
WPS-HY80.pdf
description
Fixture-Setup.pdf
Fixture-Setup.pdf
Auto Data Collection Setup J-2026-042
| Op | Operation | Work Cell | Digitized Tool | Vision Station | Manual Entry | Status |
|---|---|---|---|---|---|---|
| 10 | Saw cut | Band Saw | check_circle Auto — logs start/stop | — | — | Active |
| 20 | CNC Mill | Haas VF-4 | check_circle Auto — cycle times | — | — | Active |
| 30 | Weld | Weld Cell 2 | — | videocam Exit camera | qr_code_scanner QR scan in/out | Setup |
| 40 | NDT | NDT Lab | check_circle Auto — UT reports | — | — | Active |
| 50 | Final inspection | QA Bay | — | — | edit_note Inspector entry | Planned |
check_circle Digitized Tool (auto)
videocam Vision Station (auto)
qr_code_scanner Manual Entry (operator)
Recorded Results
| Op | Inspector | Date | Result | Notes |
|---|---|---|---|---|
| 10 | Sarah K. | Feb 10 | Pass | Heat #A2847 verified |
| 20 | Sarah K. | Feb 12 | Pass | All 6 parts within spec |
Acceptance Package Preview
check Certificate of Conformance (COC)
check CMTR — Heat #A2847
check Weld map & WPS log
radio_button_unchecked NDT report
radio_button_unchecked Final dimensional report
radio_button_unchecked Traveler sign-off summary
3 of 6 documents ready. Remaining auto-generated on job completion.
TDP Element Checklist MIL-STD-31000C
Engineering Design Data (drawings, 3D, PMI)check Complete
Manufacturing Process Descriptionscheck Complete
Quality Assurance Provisions (QAPs)check Complete
Special Inspection Equipment (SIE)radio_button_unchecked Pending
Special Tooling Listradio_button_unchecked Pending
Special Packaging Instructions (SPI)radio_button_unchecked Pending
3 of 6 elements complete
TIP — Test & Inspection Plan NAVSEA
| Test/Inspection | Type | Code | Gov't Notify | Status |
|---|---|---|---|---|
| Material cert review | In-process | (I) | No | check |
| Dimensional inspection | In-process | (I) | No | check |
| Weld visual (VT) | In-process | (V) | Yes | radio_button_unchecked |
| NDT - MT | Final | (V)(Q) | Yes | radio_button_unchecked |
| Final acceptance | Final | (I) | No | radio_button_unchecked |
TDP Metadata
3D / MBD Viewer
Classification & Security
Classification
Unclassified
Export Control
None
No DD-254 required · No special handling
Open NCRs north_east
9
3 critical
Awaiting Disposition north_east
4
2 overdue
Closed This Month north_east
12
↑ 4 vs last month
Avg Resolution north_east
3.2d
Target: 5 days
Saved Views
addSave Current Filters...
Sort by
Oldest First
Newest First
Severity High→Low
Severity Low→High
Status A→Z
Status Z→A
Operation A→Z
Operation Z→A
Filters
Operation
CNC Machining
Welding
Grinding
Heat Treat
NDT Inspection
Assembly
Coating
Forming
Boring
Turning
Milling
Blasting
Status
checkOpen
checkAwaiting Disposition
checkIn Review
checkClosed - Use As-Is
checkClosed - Rework
Severity
checkCritical
checkMajor
checkMinor
| NCR ID | Job | Part | Op | Defect | Qty | Status | Agearrow_downward | Severity |
|---|
Defect Details
Defect Type
Porosity
Qty Affected
2 of 12
Porosity detected in weld zone 3 on parts #4 and #6 during VT. Approx 3mm cluster at root pass. See attached photos.
Reported by: Mike R. · Feb 12, 2026 2:30 PM
Timeline
NCR Raised
Mike Rodriguez · Feb 12, 2:30 PM
Porosity detected in weld zone 3, bracket #4
Photos Attached
Auto-captured · Feb 12, 2:30 PM
2 photos geotagged to Weld Cell 1
Assigned to Quality
Auto-routed · Feb 12, 2:31 PM
Sarah Chen notified — requires disposition
Awaiting Disposition
Pending review
Linked Items
Job: J-2026-042
Drawing: DWG-4517-R2, Zone 3
WPS: WPS-HY80-GMAW-01
Disposition Requires Engineering
smart_toyAI Routing Logic
How F2AI auto-triaged this NCR
Delivery Timeline — All Active Jobs
On track
At risk
Need-by
Feb 3
Feb 10
Feb 17
Feb 24
Mar 3
Mar 10
J-2026-042
Pump bracket
Pump bracket
J-2026-038
Valve body
Valve body
J-2026-031
Motor mount
Motor mount
J-2025-119
Bearing plate
Bearing plate
check_circle
3D Model Comparison — J-2026-042 Bracket #3
check_circle 98.6% MatchAll critical dims within tolerance
TDP Reference — Wireframe
In-Process Scan — Solid
3 of 12 brackets scanned
Weld bead profile: consistent with WPS
Max deviation: 0.04 mm (tolerance: ±0.25 mm)
Shipyard Signal — J-2026-042
cell_tower Auto-sent to HII-Ingalls
25%
complete
3 of 12 units fabricated
3 of 12 units fabricated
Open NCRs
0
Geometry Match
98.6%
Est. Completion
Mar 15 — On track
Signal Status
✓ Sent Feb 13
Deviation Heatmap — All 12 Brackets
Scanned — within tolerance
Weld seam
Pending scan
Acceptance Events
| Job | Part | Event | Date | Status |
|---|---|---|---|---|
| J-2025-119 | Bearing plate | Accepted by yard | Jan 22 | check Accepted |
| J-2026-031 | Motor mount | Submitted for acceptance | Feb 10 | Pending |
Shipyard NCRs
| NCR | Job | Issue | Status |
|---|---|---|---|
| YARD-NCR-007 | J-2025-098 | Dimensional discrepancy | Resolved |
This Week
Next 2 Weeks
This Month
MES Synced
· 8 min ago
Finite-Capacity Schedule
J-2026-042
J-2026-038
J-2026-031
Other
Mon
3/2
3/2
Tue
3/3
3/3
Wed
3/4
3/4
Thu
3/5
3/5
Fri
3/6
3/6
Mon
3/9
3/9
Tue
3/10
3/10
Wed
3/11
3/11
Thu
3/12
3/12
Fri
3/13
3/13
Saw
042
038
045
CNC Mill
031
042
038
Weld Cell
028
042
038
NDT Lab
028
031
042
QA
028
031
042
Material Constraints
AlertHY-100 forging — J-2026-042 — Expected Feb 22, need by Feb 24
OKCRES 316L bar — J-2026-038 — In stock
Work Cell Capacity
| Cell | This Week | Load |
|---|---|---|
| CNC Mill | 38/40 hrs | 95% |
| Weld Cell 2 | 28/40 hrs | 70% |
| NDT Lab | 12/40 hrs | 30% |
3M
6M
12M
YTD
12mo Hit Ratenorth_east
34%
47 won / 138 submitted
Avg Quote Cyclenorth_east
4.2 days
Target: 3.5 days
Estimate Accuracynorth_east
94.2%
Predicted vs actual cost
Pipeline Valuenorth_east
$734K
22 active RFQs
Hit Rate by Shipyardnorth_east
HII-Ingalls
18/43
Bath Iron Works
15/39
Electric Boat
7/20
HII-Newport News
9/31
GD-NASSCO
5/20
Fincantieri Marinette
2/10
Austal USA
2/12
Estimate Accuracy by Programnorth_east
DDG-51
CVN-81
SSN-810
LPD-32
FFG-62
Quote Cycle Time Trendnorth_east
5.1
4.8
4.5
5.0
4.6
4.3
4.1
3.8
4.0
3.5
3.9
4.2
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
days to submit--- Target: 3.5 days
Hit Rate by Customernorth_east
HII-Ingalls
Electric Boat
Bath Iron Works
HII-Newport News
GD-NASSCO
Fincantieri Marinette
Austal USA
Recent Bid History last 12 months
| RFQ | Shipyard | Program | Value | Margin | Cycle | Result |
|---|---|---|---|---|---|---|
| RFQ-2026-089 | HII-Ingalls | DDG-51 | $48K | 28.2% | 2.1d | Won |
| RFQ-2026-085 | Bath Iron Works | DDG-51 | $62K | 24.5% | 3.8d | Won |
| RFQ-2026-082 | HII-Newport News | CVN-81 | $95K | 18.3% | 5.2d | Lost |
| RFQ-2026-078 | HII-Ingalls | LPD-32 | $34K | 22.1% | 2.8d | Won |
| RFQ-2026-071 | GD-NASSCO | FFG-62 | $41K | 14.8% | 6.1d | Lost |
| RFQ-2026-068 | Electric Boat | SSN-810 | $78K | 19.2% | 4.5d | Won |
| RFQ-2026-065 | HII-Ingalls | DDG-51 | $55K | 25.7% | 3.2d | Won |
| RFQ-2026-059 | GD-NASSCO | T-AO-205 | $120K | 16.9% | 5.8d | Lost |
| RFQ-2026-054 | Electric Boat | SSN-810 | $145K | 18.8% | 4.8d | Won |
| RFQ-2026-048 | Fincantieri Marinette | FFG-62 | $38K | 12.4% | 5.5d | Lost |
Work Centers
| Name | Type | Setup $/hr | Run $/hr | Capacity | Crew | Certs | |
|---|---|---|---|---|---|---|---|
| Saw Bay | Cutting | $55 | $65 | 40 hrs/wk | 1 | — | edit |
| Haas VF-4 | CNC Mill | $75 | $85 | 40 hrs/wk | 1 | — | edit |
| Mazak QTN-200 | CNC Lathe | $70 | $82 | 40 hrs/wk | 1 | — | edit |
| Weld Cell 1 | Welding | $80 | $90 | 40 hrs/wk | 1 | NAVSEA | edit |
| Weld Cell 2 | Welding | $85 | $95 | 40 hrs/wk | 1 | NAVSEA | edit |
| NDT Lab | Testing | $70 | $80 | 40 hrs/wk | 1 | NDT III | edit |
| Paint/Coat | Surface | $50 | $60 | 24 hrs/wk | 1 | — | edit |
| Assembly | Assembly | $55 | $65 | 40 hrs/wk | 2 | — | edit |
Rate Tables
| Category | Value | Notes |
|---|---|---|
| Overhead multiplier | 1.30x | Applied to direct labor |
| G&A rate | 12% | General & administrative |
| Profit target | 15–25% | Range by program type |
| Rush factor | 1.15x | Applied to total cost |
| ITAR overhead | 8% | Security handling markup |
| QA overhead | 5% | Inspection & documentation |
| Learning curve adj. | 0.90x | Repeat part discount |
Material Library
| Material | Grade | Form | $/lb | Supplier | |
|---|---|---|---|---|---|
| Steel | HY-80 | Plate | $4.20 | Metal Suppliers Inc | edit |
| Steel | HY-100 | Plate | $5.10 | Metal Suppliers Inc | edit |
| Stainless | 316L | Bar | $6.80 | Atlantic Alloys | edit |
| Stainless | 304 | Sheet | $5.90 | Atlantic Alloys | edit |
| CuNi | 70/30 | Pipe | $12.50 | Copper & Brass Sales | edit |
| Aluminum | 5456-H116 | Plate | $3.80 | Alco Metals | edit |
| Bronze | C95800 | Bar | $9.40 | National Bronze | edit |
Routing Templates
Machined Block (standard)
Edit arrow_forward
Saw → Mill → Deburr → Inspect · 4 ops
Weldment Assembly
Edit arrow_forward
Saw → Fit → Weld → NDT → Inspect · 5 ops
Pipe Spool
Edit arrow_forward
Cut → Bevel → Fit → Weld → Hydro → Inspect · 6 ops
Bearing Housing
Edit arrow_forward
Saw → Lathe → Mill → Grind → Inspect · 5 ops
Structural Bracket
Edit arrow_forward
Saw → Mill → Weld → Coat → Inspect · 5 ops
info
Visible to Bid/PM (view rates & materials), Planner (full edit), Quality/Eng (view; edit routing templates). Not visible to Operators.
My Work
Mike R. · Weld Cell 2 · Day Shift
All (4)
Due Today (2)
Overdue
High Priority
Pump bracket
J-2026-042 · Op 30 — Weld
12 pending
Mar 15
Ready
Valve body
J-2026-038 · Op 30 — Weld
3 of 6 remaining
Mar 5
In Progress
Motor mount
J-2026-031 · Op 30 — Weld
8 of 8 remaining
Feb 28
Due Today
Hatch frame
J-2026-028 · Op 40 — Weld repair
1 rework
Mar 10
NCR Rework
My Work
My NCRs
Settings
← Back
Op 30 — Weld
J-2026-042 · Pump bracket
Work Instructions
1. Verify heat number on traveler. Record on weld log.
2. Set up fixture per DWG-4517-FIX. Align to ±0.010".
3. Weld per WPS-HY80-GMAW-01. Filler: ER100S-1.
warning CAUTION: Preheat 200°F min. Max interpass 400°F.
3D Quick Look
BKT-4517-HY80
HY-80 · Qty: 12
Attachments
architecture Drawing
description WPS
build Fixture
Completed:
3
of 6
← Cancel
Report NCR
J-2026-042 · Op 30 — Weld · Pump bracket
2
photo_camera
add
My NCRs
NCR-040
J-2026-038 · Material surface defect — Saw
Open
1d ago
NCR-037
J-2026-028 · Weld undercut — repair pending
In Review
4d ago
NCR-033
J-2025-119 · Dimensional variance — bearing bore
Closed
18d ago
My Work
My NCRs
Settings
Settings
Profile
Name
Mike Rodriguez
Role
Welder / Operator
Shift
Day (6AM - 2:30PM)
Employee ID
MR-0847
Work Center
Change if floating to a different cell today
Sync Status
Last synced: 2 minutes ago
Queued items: 0
circle Online
My Work
My NCRs
Settings